Steel-plastic Geogrid for Road Construction

Steel-plastic reinforced geogrid is made of steel-plastic reinforced tape compounded by a novel process, the surface of this product has a regular coarse pattern can withstand the huge anti-stress and friction with the fill.
Widt:
Color:
Length:
Availability:
Quantity:
  • Steel-plastic Geogrid

  • Zhongloo


Product introduction

The steel plastic welded geogrid uses high tensile steel wire (or other fiber)specially handled and polyethylene(P.E)with other assistants. Then squeeze it out and make it become composite high-strength anti-pull belt and the surface has rough embossing then it is reinforcement earthwork belt.Warp knitting vertically and horizontally using this single belt and welding the joint using a special welding techology to molding is reinforcement geogrid


Technical parameter


ProjectTGSG30-30TGSG45-45TGSG60-60TGSG80-80TGSG100-100TGSG120-120
Two-way Limit-Rally
(KN/m)≥
30456080100120
Two-way Limit elongation
(%)≤
333333
Elongation at 1% of the
Rally   (KN/m)≥
233648638198



Product Features

1.The intensity is high and the distort is small;

2.The wriggle is small;

3.Anti-corrosive,the life is long,the geogrid take the plastic material as a  protector, auxiliary  enables it by each kind of assistant to have the antiaging,the oxidation susceptibility again,but acidproof ,alkali,salt and so on adverse circumstance corrosion.Therefore ,the steel modles the earhwork gril to be possible to  meet each kind of permanent work100year above use need,and the perfor mance is superior,the size stability is good;

4.The construction is convenient ,the cycle is quickly short.the cost is low;the steel plastic complex  geogrid to lay down,joining ,the localization to be easy,to be smooth,avoids overlapping crossover,but reduced the project cycle effectively,saved the building cost of projects by 10%-50%.


Previous: 
Next: 

ABOUT US

PRODUCTS

NEWS

CONTACT US

  +86-18095658976
 +86-551-65540070
  shaun@zhongloo.com
  Innovation Entrepreneurship Park Economic Development District in Hefei, Anhui China
Leave a Message
Copyright © 2021 Anhui Zhonglu Engineering Materials Co., Ltd. | Sitemap    Support by Leadong