How to use Geotextile Tube ?

Views: 200     Author: Site Editor     Publish Time: 2022-08-10      Origin: Site

How to use Geotextile Tube ?

Every geotextile tube project is unique. As such, general guidelines can be described, but each project requires consultation with a geotextile tube expert to identify the project's singular attributes and to design the sludge dewatering process accordingly. It is of utmost importance to place the geotextile tube on a level ground and before deploying, any barriers ,such as stone ,sundry , have to be removed as to prevent them from influencing the deploying effect. After the geotextile tube delivered to the site, secure it on ground with external steel pipe or timber pile to fix the position of geotube. Prepare the feeding equipment in advance, like cutter head and suction dredge (for dredged materials), feed pump (for sludge materials),which are to be used in the following operations.
Geotextile tube have a "shirt-sleeve" style filling port. Simply place the pump hose into the port and secure it with a hose clamp, tie-wire or duct tape. Once the pumping begins, clear, effluent water will drain from the tube through the small openings in the permeable geotextile fabric. Meanwhile, the sludge dewatering tube bottom will develop a filter cake quickly, so the water will decant mainly out of the sides and top of the tube gradually.
After a long-time cycle of repeated cycles of filling and dewatering, over 99% of solids are captured. Typically, the decanted water can be returned to waterways without additional treatment. If any erosion caused around the tube, deploy the sump pumps at the all four corners of the area to collect the effluent.
Notes:
1- During pumping, the elevation or height of the tube needs to be monitored to prevent ruptures. Typically, keep the height to be 80% is more a optimum.
2- The sands gathered the most at the entrance of port , so adjust the sand concentration at the proper time to assure the sands depositing smoothly.
3- To fill the tube to its required height, the designed height should be equal or greater than the half of the diameter of geotextile tube.
4- The sand concentration of the dewatered material shoul.

geotube00



geotube


Anhui Zhonglu Engineering Materials Co., Ltd. can assist you in one-stop procurement of geotechnical products. We have advanced production lines and professional R & D engineering service teams. If you have any needs, please feel free to contact us.


Angela Gao

Professional geosynthetics manufacturer
Anhui Zhonglu Engineer Materials Co., Ltd

Address: 2-3C, Innovation And Entrepreneurship Park, Hefei City, Anhui Province,China

Tel./Wechat/Whatsapp: +86 18095658976

Email: angela@zhongloo.com

www.zlgeo.com


ABOUT US

PRODUCTS

NEWS

CONTACT US

  +86-18095658976
 +86-551-65540070
  shaun@zhongloo.com
  Innovation Entrepreneurship Park Economic Development District in Hefei, Anhui China
Leave a Message
Copyright © 2021 Anhui Zhonglu Engineering Materials Co., Ltd. | Sitemap    Support by Leadong