Steel Plastic Geogrid Driveway Geogrid Gravel Grid Ground Grid Biaxial Steel Plastic Geogrid Price For Road Construction
Steel-Plastic Geogrid is made from high-strength steel wire (or other high-performance fibers) that undergoes specialized surface treatment. The treated wire is then combined with polyethylene (PE) or polypropylene (PP) and other additives, and extruded into high-tensile strength strips with a rough, embossed surface to enhance friction and bonding with soil.
These reinforced geotechnical strips are arranged in both longitudinal and transverse directions at specified intervals or clamped configurations. The structure is then formed using advanced bonding and welding technology, resulting in a high-strength, durable geogrid suitable for soil reinforcement and load-bearing applications.
POLYESTER GEOGRID
Polyester geogrid is an advanced geosynthetic material designed to reinforce road surfaces and subgrades. It is composed of high-strength polyester yarns coated with an inorganic sizing agent, providing excellent mechanical properties and durability.
Features:
High tensile strength with low elongation
Superior tear resistance
Strong interlocking with gravel and soil
Excellent corrosion resistance, aging resistance, and alkali resistance
Application:
Widely used for reinforcing soft soils in railway and roadway construction, improving load distribution and extending pavement lifespan.
Product Features
High strength and high rigidity
Due to the use of high-strength steel wire as the main bearing material, the steel-plastic geogrid has excellent tensile strength and rigidity, which can effectively enhance the stability and bearing capacity of the soil
When the bidirectional strength is used on the surface of the plastic, the rid is pressed into rough pattern to reinforce the roughness of geogrid surface, increase the friction factor between the geogrid and soil.
Strong corrosion resistance
The outer layer of the grid is wrapped with polymer materials such as polyethylene (PE) or polypropylene (PP), and antioxidants, anti-ultraviolet agents and other additives are added, so that it can be used for a long time in acid-base environment and humid conditions without aging.
This geogrid is low cost and easy to construct, easy to pave, lap, locate, avoid the repetition and cross, so shorten the construction period obviously.
The surface of the steel-plastic geogrid has a rough embossed structure, which can form a strong friction in the soil, enhance the interlocking effect between soil particles, and improve the overall stability.
High strength, small creep deformation, suitable for various environmental soils.
Convenient construction adaptability
The grid is light in weight, easy to cut and splice, and is suitable for various complex terrains, such as soft soil foundation reinforcement, slope protection, retaining wall reinforcement and other projects, improving construction efficiency and reducing costs.
Improve the interlocking and the occlusion of the reinforcement supporting surface.
Company Profile
Construction Method
1. The slope shall be laid in order from top to bottom. Don't pull it too tight.
2. Tow adjacent longitudinal joints should not be in a horizontal line, should bestaggered more than 1m each other.
3. Longitudinal joints should be more than 1.50m away from the dam foot and bending foot, and should be located on the plane.
4. When the slope is laid, the direction of spreading film should be basically parallel to the slope line.
5. The construction, first of all to use small diameter sand or clay levelingbase, and then laid the geomembrane. The geomembrane should not be stretched too tight, and the part of the soil bured at both ends is corrugated. A transitional layer of about 10cm is laid on the geomembrane with sand or clay.
Company Profile
Construction Method
1. The slope shall be laid in order from top to bottom. Don't pull it too tight.
2. Tow adjacent longitudinal joints should not be in a horizontal line, should bestaggered more than 1m each other.
3. Longitudinal joints should be more than 1.50m away from the dam foot and bending foot, and should be located on the plane.
4. When the slope is laid, the direction of spreading film should be basically parallel to the slope line.
5. The construction, first of all to use small diameter sand or clay levelingbase, and then laid the geomembrane. The geomembrane should not be stretched too tight, and the part of the soil bured at both ends is corrugated. A transitional layer of about 10cm is laid on the geomembrane with sand or clay.
Q:Can you send samples? A:Yes,we are very happy to provide you with free samples to check the quality of our products.
Q:Are you a manufacturer or a trading company? A:Our company located in Hefei,Anhui Province,with are gistered capital of 52 miion yuan.It is a professiona lmanufacturer of geomembrane,geotextile,geogrid and other products.So we have the competitive price with best quality.
Q:Can you produce the product according to customers' requirements? A: Sure,we are professional manufacturer,OEM and ODM are both welcome.
Q:How long is the delivery time? A: General within 3-7days after received the deposit.
Q: How to control product quality? A: Our factory adopts lean management,products from the beginning to the end of the production process have strict quality control.All products must be strictly tested before packing and shipping.